Six Sigma and the Planning “P”

Advertisements

In this episode I dusted off a LinkedIn article I wrote in November 2017 comparing the Six Sigma DMAIC methodology and the All-Hazards Planning “P” process.

Six Sigma and the Planning “P”

Throughout the episode I verbally walk the listener through the DMAIC to Planning “P” concept map I created to the left and share how I believe Six Sigma and all-hazards incident management skills crossover and converge in many places. For Six Sigma practitioners the Design Measure Analyze Improve Control or DMAIC methodology is very familiar and for green and black belts DMAIC is second nature. For IMT members, the Planning “P” and should be second nature.

https://media.blubrry.com/peopleprocessprogress/content.blubrry.com/peopleprocessprogress/PPP68-Concept_Mapping_SIx_Sigma_DMAIC_to_the_All-Hazards_Planning_P_.mp3
LISTEN HERE: PPP68: Concept Mapping Six Sigma DMAIC and the All-Hazards Planning “P”
PPP68 Field Reference

There is much common ground between these two processes and knowledge areas. Both Six Sigma and All-hazards Incident Management processes focus on identifying problems. They facilitate brainstorming solutions. Prompt us to collect data. Each of these provide processes or product improvement through efficient application of personnel and resources. 

Stay safe, wash your hands and Godspeed,

Kevin

Kevin Pannell, PMP, Creator & Host, ‘People, Process, Progress’ podcast
Build the Foundation | LinkedIn | Instagram | Facebook | Twitter
*Please leave a review on Apple Podcasts and subscribe below to the podcast and YouTube channel

Subscribe to the podcast to hear more

1 thought on “Six Sigma and the Planning “P”

Leave a Reply Cancel reply

Hours Typically before 0800 and after 1700. Gotta pay the bills.
search previous next tag category expand menu location phone mail time cart zoom edit close
%%footer%%